Case study filter

An ideal home to support IMG Media’s growth plans

Project features

Size

Over 100,000 sq ft

Location

London

Project type

Office fit out

Duration

20 Weeks

Environmental

77% of waste was reused

As part of its expansion strategy, IMG Media asked us to fit out a three-storey, 1980s steel-frame building.

To provide state-of-the-art media facilities and flexible ways of working, we carried out extensive modifications to 107,000 sq ft of space. Covering three floors linked by existing full-height atrium glazing, the project included creating a new media studio, an editing suite, general office space, and catering facilities.

We installed a new entrance to the rear of the building, and erected an external satellite farm, complete with a new generator. Our specialist team coordinated all elements of the media installation, and liaised with IMG’s own media contractors. We incorporated cutting-edge media infrastructure and equipment into the architectural elements, all to the highest acoustic standards.

To test the acoustics, we produced mock-ups and benchmarks, and carried out rigorous quality inspections. We’re also proud of the project’s environmental achievements: we reused, recycled or recovered 77% of the waste generated, diverting 49.1 tonnes of waste from landfill. 

Key contacts

Contact us

Thank you for contacting Overbury

One of our team will be in touch regarding your query shortly. While you wait for us to respond you can find out more about Overbury through the links below:

Who we are
Overbury FAQs
Our Approach
Case Studies
Clients
Our offices

Case study filter

Case study filter

Latest case studies

View all case studies