Projects over £12m
Get in touch
Projects up to £12m
Corporate partnerships + higher education
77 Newman Street London W1T 3EW
0207 307 9000
17 Gresse St London W1T 1QL
020 7307 4400
Managing Director, Southern
Southern
Maxis 1 Western Road Bracknell RG12 1RT
Managing Director, Central
Business Development Manager
Account Manager
Fort Dunlop 207 Fort Parkway Birmingham B24 9FD
0121 748 8600
Managing Director, Northern
Director - Northern
Business Development Manager, Leeds
13th Floor Chancery Place 50 Brown Street Manchester M2 2JT
0161 829 3400
First Floor 6 East Parade Leeds LS1 2AD
0113 241 2000
Scotland Lead
North + Scotland
Trilogy One 11 Woodhall Eurocentral Motherwell ML1 4YT
0141 248 8688
Home Case studies Tarmac
Following the successful completion of the design and Cat A refurbishment of the T3 office buildings in Trinity Park, Birmingham, Overbury was appointed by tenant Tarmac to deliver the Cat B fit out of their office space on the ground floor within T3.
"Having everything under one roof worked really well. That goes from design through to delivery. You are a one stop shop and that worked really well."
The fit out of this 17,000 sq ft space included the design and development of a collaborative, open plan office space, complete with meeting rooms and a large community breakout area. Overbury completed works adapting the heating, ventilation and air conditioning (HVAC) systems as well as installing new exposed mechanical and electrical systems.
We reused furniture from Tarmac’s previous office, Portland House (just 320 metres away) and utilised biophilia to create soft partitions in the open plan office space.
The new office layout focused on providing the client with a new, post-pandemic way of working, with collaboration being the key driver. The different corners of the office provide employees with different concepts of working – there are 100 fixed desks alongside several hot desks and ‘touchdown’ positions. Tarmac have introduced a hybrid way of working across the business, with many employees working from home up to four days a week, so it was important to reflect this flexible way of working across the design.
Tarmac’s new space provides a precedent for their other offices nationwide, with a desire to roll out similar fit outs across their portfolio.