Projects up to £12m
07971 603104
Projects over £12m
07970 298549
Corporate partnerships + higher education
07814 668353
77 Newman Street London W1T 3EW
0207 307 9000
17 Gresse St London W1T 1QL
020 7307 4400
Managing Director, Southern
07973 157869
Southern
07970 114890
Maxis 1 Western Road Bracknell RG12 1RT
01344 386 600
Managing Director, Central
07976 937069
Business Development Manager
07814 067974
Central
07712 870914
Fort Dunlop 207 Fort Parkway Birmingham B24 9FD
0121 748 8600
Managing Director, Northern
07581 472506
Director - Northern
07964 627025
Business Development Manager, Leeds
07976 609066
13th Floor Chancery Place 50 Brown Street Manchester M2 2JT
0161 829 3400
First Floor 6 East Parade Leeds LS1 2AD
0113 241 2000
Scotland Lead
07583 694411
North + Scotland
07813 056023
Trilogy One 11 Woodhall Eurocentral Motherwell ML1 4YT
0141 248 8688
Home Case studies Fora Co-Working Fit Out | Borough
We teamed up with Fora to deliver their vision for new co-working spaces. Set to create a new standard in the industry with a premium hotel-style service which creates a retro, yet modern design with innovative technology to support their residents.
We helped them provide a new seven-floor co-working space that includes everything from conference rooms and bike storage to showers and a restaurant. This is topped off with all the normal agile working spaces you'd expect from leaders in co-working.
The entrance to Fora's Brandon House space sought to replicate the feeling of a boutique hotel, with a concierge service for their residents and guests. The space has casual working spaces and a café where guests can help themselves to coffee and refreshment and work in a semi-private and uninterrupted café atmosphere. No more asking the waiter for WiFi at their local café!
The café-style reception features bespoke joinery and a hard-wearing polished concrete floor to finish off the industrial look, which also complements the local surrounds in Borough. This is paired with the exposed services to elevate the visible ceiling and give the reception a heightened sense of space.
As they move to the lower ground floor, they're treated to a stunning double-height centrepiece; a tree that rises through the chandelier void to the ground floor. This creates a focal point for the casual working area, which complements the detailed joinery and high-end finishes that have been used throughout the project. Besides, where else in London can you work in front of a tree rising through the ceiling?
This co-working space well and truly reflects the natural environment, creating a haven away from the bustle of Borough High Street. Guests are greeted with an abundance of natural tones and finishes in the reception, from the wooden joinery to the dark blue and green cushions.
The mix of recycled material finishes, biophilia and wellbeing initiatives helped us achieve a BREEAM Excellent rating.
Often, co-working spaces are used by smaller businesses to quickly gain access to a dedicated, centrally-located meeting space. This means a variety of meeting spaces are incredibly important for Fora's clientele. To ensure the space is fully utilised, and to avoid any meeting clashes, all meeting and office spaces are set up with wall-mounted iPads for booking management.
While this space may look like a trendy café with booth seating, it's actually meticulously designed for its setting. There's glass partitioning between each booth to boost privacy and reduce noise transfer, and the booths are fitted with a white noise filter to minimise any potential disruption when neighbouring booths are being used simultaneously.
This was a large project that was delivered under a tight 36-week programme, with only one week pre-construction to kick things off before the build began. We ensured procurement, design and construction were simultaneously working side-by-side to ensure the programme was met and delivered within the client's budget.
We organised for weekly full-day design workshops to quickly sign off drawings and samples, ensuring the momentum of the project was maintained. Due to the level of architectural detail and desired finishes, we also organised for weekly cost-control meetings to capture cost variations, making sure that Fora was fully involved in the development of their latest space.
View project