Projects over £15m
Get in touch
Projects up to £15m
Corporate partnerships + higher education
77 Newman Street London W1T 3EW
0207 307 9000
17 Gresse St London W1T 1QL
020 7307 4400
Managing Director, Southern
Southern
Maxis 1 Western Road Bracknell RG12 1RT
Belsyre Court 57 Woodstock Rd Oxford OX2 6HJ
100 Victoria Street Bristol BS1 6HZ
Managing Director, Central
Business Development Manager, West Midlands
Business Development Manager, East Midlands
Business Development Manager, East of England
Account Manager
Fort Dunlop 207 Fort Parkway Birmingham B24 9FD
0121 748 8600
Managing Director, Northern
North + Scotland
Business Development Manager, Leeds
13th Floor Chancery Place 50 Brown Street Manchester M2 2JT
0161 829 3400
First Floor 6 East Parade Leeds LS1 2AD
0113 241 2000
Seventh Floor 1 St James' Gate Newcastle NE1 4AD
Trilogy One 11 Woodhall Eurocentral Motherwell ML1 4YT
0141 248 8688
Home Case studies Bruntwood
The Renold Building is the first step in the creation of Sister, a vibrant new city centre neighbourhood set to transform the University of Manchester’s former North Campus into a thriving innovation hub.
"Your team have been absolutely fantastic and this has been a genuinely great journey. You always had your eye on the ball and nothing was ever too much trouble."
Bruntwood appointed us to deliver the CAT A and B refurbishment of The Renold Building, converting the former lecture theatre building into a modern, commercially viable community asset.
Working in collaboration with SpaceInvader Design, we transformed the landmark Grade II listed building into a new destination for Manchester's emerging talent. We retained as much of the existing structure as possible, while introducing a community café and flexible coworking lounges alongside repurposed lecture theatres, while generating £1.8m in social value for the local community.
As the first phase of activation for the wider Sister district, the Renold Building needed to open quickly and build momentum for the regeneration journey ahead. Agile decision making, close coordination and efficient sequencing helped the project move at pace, enabling the team to adapt the building’s structures, floorplates and service routes for modern workplace use without delay.
Rather than stripping the building back to the structure, we made the most of the existing fabric, services, finishes and furniture to reduce waste and retain key architectural features.
Over 95% of existing furniture, fixtures and equipment were retained or repurposed. Demolition materials, salvaged joinery, scaffolding, fluorescent tubes and original furniture have been reworked into new lighting, counters, work settings and bespoke interior features. Quality control at every step ensured that reclaimed, reused and newly specified materials achieved the required durability, finish and performance.
Alongside this, mechanical, electrical and plumbing enhancements have significantly improved the building’s operational performance, providing a more efficient and future ready workplace.
As the first completed project within Manchester's new innovation district, The Renold Building establishes the direction for the wider development. Winner of the BCO Northern Innovation Award, the project opens up new opportunities for the city and demonstrates the value of rethinking existing buildings.
View project