Projects over £15m
Get in touch
Projects up to £15m
Corporate partnerships + higher education
77 Newman Street London W1T 3EW
0207 307 9000
17 Gresse St London W1T 1QL
020 7307 4400
Managing Director, Southern
Southern
Maxis 1 Western Road Bracknell RG12 1RT
Belsyre Court 57 Woodstock Rd Oxford OX2 6HJ
100 Victoria Street Bristol BS1 6HZ
Managing Director, Central
Account Manager
Business Development Manager, West Midlands
Business Development Manager, East Midlands
Business Development Manager, East of England
Fort Dunlop 207 Fort Parkway Birmingham B24 9FD
0121 748 8600
Managing Director, Northern
North + Scotland
Business Development Manager, Leeds
13th Floor Chancery Place 50 Brown Street Manchester M2 2JT
0161 829 3400
First Floor 6 East Parade Leeds LS1 2AD
0113 241 2000
Seventh Floor 1 St James' Gate Newcastle NE1 4AD
Trilogy One 11 Woodhall Eurocentral Motherwell ML1 4YT
0141 248 8688
Home Case studies Thames Water
Thames Water's move to Newbridge Square represents a major investment in its people and future operations in Swindon. The new workplace gives its contact centre teams a modern, high quality environment suited to hybrid working, while contributing to the town's wider regeneration plans.
As hybrid working changed how the organisation used its office space, Thames Water relocated its Swindon call centre to a more central home. Fewer desks were being used, so the move meant they could rethink how the workspace could provide a better experience for employees. Working alongside specialist subcontractors, we brought AWW's design to life, making the most of the new floorplate and retaining the strong sense of culture built in the previous office.
By its nature, a contact centre can be a noisy place. To combat this, the open plan work areas have acoustic rafts, wall panels and specialist finishes to manage noise levels for people on calls. Pods and focus areas provide extra space for when privacy and concentration are needed. A large town hall space doubles as a training room, with a folding wall further adding to its flexibility.
Increasing sustainability was another driver behind Thames Water’s move. The space’s existing raised access flooring and fan coil units have been retained wherever possible, and new fittings are low carbon and energy efficient. During the fit out, 97% of the site waste was recycled.
A busy city centre location meant we had to think smart about how to replace major M&E systems without closing roads and disrupting local businesses. Drawing on past experiences, our detailed planning meant we knew the best way was to dismantle the large mechanical and electrical equipment to bring it into the building without cranes or road closures. This meant less disruption in Swindon town centre and helped keep the fit out on track.
By rethinking how space is used, Thames Water now has a workplace that delivers a bigger impact from a smaller space. Flexible, efficient and built around the realities of contact centre work, it provides a strong foundation for the team's next chapter in Swindon.
View project