Projects up to £12m
07971 603104
Projects over £12m
07970 298549
Corporate partnerships + higher education
07814 668353
77 Newman Street London W1T 3EW
0207 307 9000
17 Gresse St London W1T 1QL
020 7307 4400
Managing Director, Southern
07973 157869
Southern
07970 114890
Maxis 1 Western Road Bracknell RG12 1RT
01344 386 600
Managing Director, Central
07976 937069
Business Development Manager
07814 067974
Central
07712 870914
Fort Dunlop 207 Fort Parkway Birmingham B24 9FD
0121 748 8600
Managing Director, Northern
07581 472506
Director - Northern
07964 627025
Business Development Manager, Leeds
07976 609066
13th Floor Chancery Place 50 Brown Street Manchester M2 2JT
0161 829 3400
First Floor 6 East Parade Leeds LS1 2AD
0113 241 2000
Scotland Lead
07583 694411
North + Scotland
07813 056023
Trilogy One 11 Woodhall Eurocentral Motherwell ML1 4YT
0141 248 8688
Home Case studies KCL Advanced Therapy Centre
The KCL Advanced Therapies Centre provides academics and clinicians with drug manufacturing capabilities and experimental medicinal research facilities.
We took some of our project managers to visit site to show them how well everything was being managed.
Having secured £30m in funding from both public and private sector organisations, King’s College London were keen to find a contractor that they could entrust to deliver the new fit out of a world-class Advanced Therapy Centre at Guy’s and St Thomas’ NHS Foundation Trust. The fit out delivered new collaborative (pre-clinical) laboratory and office spaces, including new toilets, lift lobbies and breakout areas.
The Centre develops cutting-edge experimental treatments with the aim of revolutionising the way patients are treated for diseases like cancer and diabetes, globally. Bringing together world-leading academics and clinicians, drug manufacturing capability and experimental medicine research facilities, the Advanced Therapy Centre was developed by KCL in partnership with the National Institute for Health Research (NIHR).
As this was an occupied hospital, we had to safely navigate some extremely difficult logistics routes, via a loading bay, occupied basement areas and up a good lifts or stairs to Level 10. This meant that deliveries and waste management were carefully planned, controlled and limited to certain times.
In order to secure the full funding for the project, we were required to complete on a specific date. Despite over 100 change control instructions and a substantial amount of redesign, we delivered the project within the original timescales. Also, in line with the client’s sustainability objectives, this project achieved SKA Gold.
View project