Projects up to £12m
07971 603104
Projects over £12m
07970 298549
Corporate partnerships + higher education
07814 668353
77 Newman Street London W1T 3EW
0207 307 9000
17 Gresse St London W1T 1QL
020 7307 4400
Managing Director, Southern
07973 157869
Southern
07970 114890
Maxis 1 Western Road Bracknell RG12 1RT
01344 386 600
Managing Director, Central
07976 937069
Business Development Manager
07814 067974
Central
07712 870914
Fort Dunlop 207 Fort Parkway Birmingham B24 9FD
0121 748 8600
Managing Director, Northern
07581 472506
Director - Northern
07964 627025
Business Development Manager, Leeds
07976 609066
13th Floor Chancery Place 50 Brown Street Manchester M2 2JT
0161 829 3400
First Floor 6 East Parade Leeds LS1 2AD
0113 241 2000
Scotland Lead
07583 694411
North + Scotland
07813 056023
Trilogy One 11 Woodhall Eurocentral Motherwell ML1 4YT
0141 248 8688
Home Case studies King's College London
Character preservation paves the way for transformative research facility in central London with increased capacity. King's College London's South West and Quadrangle Buildings are now a modern environment for learning.
King's College London's refurbishment spanned both the South West Building (SWB) and the Quadrangle Building (Quad). Both buildings, with their rich heritage, demanded meticulous attention to detail to preserve their character. The SWB's two basement levels and the Quad, located two levels below the quadrangle courtyard, were stripped back to shell and core. This process involved extensive demolition and asbestos removal to reveal the exposed brickwork. The reimagined space allows the university, having outgrown their existing space, to increase student numbers into the school.
During the South West Building's refurbishment, sustainability took centre stage. The 100-year-old building's concrete slab was repurposed on-site and used as hardcore for the foundations of the statement concrete spiral staircase. This strategic move minimised waste and lowered CO₂ emissions, aligning with the targeted SKA Gold rating. Logistics played a crucial role in ensuring we minimised disruption while working on a live university campus. We installed ramps and a platform lift to enhance accessibility and careful planning ensured the project did not affect teaching within the building. Notably, we used temporary soundproof partitions around teaching spaces to mitigate disruption. Weekly client meetings and site walks were also introduced to communicate the projects progress.
King's College London's project includes the installation of new AV services including new moveable screens, speakers and microphones to enhance the learning experience. A new induction loop has also been installed to the open teaching spaces making learning accessible to all. The final touch involved careful planning to ensure the project's completion aligned with the start of the new academic term in September. Furniture orders were included in the program, ensuring that both the SWB and Quad spaces were ready to welcome students promptly.
View project